Adjustments and Additional Costs are different.
Generally Adjustments are used when making an adjustment to the entry of the original asset eg the amount was wrong or the depreciation was incorrect. So an adjustment to the cost or depreciation will also adjust the WDV of the original asset.
Additional costs are for assets connected to the main asset and treated in the same way eg a lunch room renovation in a building. This will add to the cost of the asset